GENERAL USE OF 5000 SERIES JAW CRUSHER AND PLANT TERMS AND CONDITIONS

ALWAYS

ALWAYS

Return with a full tank of fuel

Use on level ground. Do not operate near trenches or sloping ground

ALWAYS

Check machine for engine oil, hydraulic oil and coolant

ALWAYS

Keep machine sufficiently greased

ALWAYS

Empty crusher and conveyor before shutting down

NEVER

NEVER

Place hands in the jaw area

Put reinforced concrete or metal through the crusher, this will damage the conveyor belt

NEVER

Adjust jaw size whilst crushing. Allow the hopper to empty before adjusting aperture size

NEVER

Crush asbestos products

NEVER

Push material through the jaw with an excavator. Turn crusher off and empty by hand

CONDITIONS TO THIS HIRE CONTRACT

INSURANCE DESCRIPTION 

Any damage caused to a machine is the hirers responsibility, this includes but is not limited to: tracks, hydraulic pipes, conveyors belts, windows and panels etc. The equipment will be supplied with a full tank of fuel, on return it is to be refilled by the hirer. Any failure to return the machine with a full tank will result in an additional surcharge of £2 per litre of fuel equal to a full tank. Should the machine not be returned in a clean condition a surcharge for cleaning costs will be applied. Payment due on receipt of the machine any queries/disputes must be notified within 7 days. 

You must ensure that you are properly covered by insurance in respect of any liability, including theft and damage and accept the total replacement value of the above equipment. Proof of insurance may be requested on delivery. 