Past Projects
Some of Our Latest Work
House Extension - Falkirk
April, 2022
Our Red Rhino 5000 was on hire to a local builder to crush the remains of a knocked down garage, patio and concrete floor. The builder was more than happy as it was saving him the cost of removing the rubble via skips. The crushed rubble was then used on site to back fill a retaining wall and the remaining will be used to fill sub floors of the new extension. No need for skip hire costs or bought in aggregates from a quarry.
When access was tight and material couldn't be moved from site by 8 wheel tippers, our crusher managed to crush the rubble knocked down from the double garage. Saving the client money from recycling the hardcore waste on site and turning it into a reusable product. This being a great saving to the builder by not buying in material from a local quarry.
House Extension - Stirling
March, 2022
Site Clearance - Burntisland
February, 2022
This is where our crusher was worth its weight in gold. Where access was that limited even a 4x4 couldn't get through. The Red Rhino 5000 was easily tracked down a tight alleyway off the main high street. It was used along with the mini digger to clear and extend the site by removing and crushing old stone walls, brick sheds and concrete floors to prepare the site for the client to build a new property.